Atrenta Inc. :: Early Design Closure Contact Us  
Atrenta solutions and products information Atrenta customers Atrenta partners Support Section About Atrenta Careers in Atrenta - Join Hands
 
 
 
      Overview
   Products
   The Stakeholders
  RTL Engineer
  Verification Engineer
  Chip Integration Lead
  Physical Design Lead
  Design Manager
      Datasheets
      White Papers
 
 
Physical Design Lead

For today's SoC, place and route is the place where proverbial "rubber meets the road". Typically place and route teams receive a netlist hand-off from implementation teams with constraints and floorplan suggestions.

Place and route teams do spend considerable amount of time ensuring that constraints are consistent, complete and coherent. Initial place and route efforts also uncover many congestion areas for the first time. To remedy these issues, usually global iterations with RTL engineers and implementation teams are required. Predictable physical design closure in timing, area, power, signal integrity and yield areas, is not a common occurrence. Floorplan iterations and timing related ECOs are quite time-consuming.

However, Atrenta products and methodologies ensure that the closure of key elements of design is already achieved when the design database arrives at place and route stage. All the individual blocks are well characterized for gate count/die area, possible congestion scenarios, critical paths and constraints. The final closure effort in place and route stage is much more predictable and much shorter.

© Copyright 2008 Atrenta Inc. | Privacy Policy